Installation

Inulated Metal Panels Installation

Instructions are provided as a general guide to Eco-Insulated customers and their contractors. Also, an onsite expert can be made available upon request to assist with your project, if required (additional charges will apply.)

Eco-Insulated Panel Manufacturing Inc. will NOT be responsible for any claim resulting in inadequacies. The installer is responsible for determining the adequacy of anchoring panels to framing materials, structures and girts.

The installer is responsible for ensuring safe erection practices that may be defined and made mandatory by federal, provincial, municipal and/or local authorizations. If the installer cannot safely assemble the wall it is his/her responsibility to stop all work and contact Eco-Insulated.

Below you will find links to metal insulated panels manual that covers the topics of installer checklist, panel support, panel fasteners, panel caulking and sealants, lifting panels, vertical panel joint, field cutting, parapet flashing, cleaning and repair.

Also see "Handling Manual" below

Connections

Self-drilling screws supplied by Eco-Metal must be used as recommended. Leakage may occur if screws are either overdriven or under driven. Screws will be exposed on exterior of building, drilling directly through panel attaching to structural support with a minimum of 2 pieces per steel profile. SEE DIAGRAM BELOW. Panels may be fastened directly to masonry walls.

Wall Connection

 

Wall Connections

 

Connection to Masonry

 

Connection to Masonry

Roof Connection

 

Roof Connections

 

Connection to Steel

 

Connection to Steel
Eco-Insulated Panel Manufacturing Facility

LOCATION:

HEAD OFFICE &
MANUFACTURING FACILITY
SOUTHWESTERN ONTARIO
LONDON / DORCHESTER

ADDRESS:

531 Shaw Road
Dorchester, Ontario
N0L 1G4
CANADA

CONTACT / HOURS:

Phone: 519-451-7663
Fax: 519-451-7669

Toll free: 1-855-838-9393
Email: info@ecoinsulatedpanels.com
Hours: Mon - Fri 8:30AM - 5PM